Our completed-project register records the Ajman G+6P+18 Residential Building with Eagle Eye Construction. For a building with this configuration, the stone package changes character as it moves upward: podium levels tend to contain more transitions and special interfaces, while the residential stack depends on disciplined repetition.
We treated repetition as a controlled reference rather than an assumption. Once the recurring floor logic is established, dimensions, joints, edges and fabricated pieces can be coordinated around that benchmark, but the active floor still needs verification before installation because actual site conditions can move away from drawings.
The archive does not identify the exact marble or the spaces in which it was installed, so we do not invent a room schedule. What this completed record demonstrates is experience carrying marble and stone work through a residential tower where the quality seen on the eighteenth residential floor has to remain connected to the standard established much earlier in the programme.